Services

Our team of field engineers is available at various locations (Off-Shore & On-Shore) at construction and end-users sites around the globe at all times. All personnel of our team is highly qualified, trained and motivated to solve problems as they arise.

Each engineer have all the industry involved OPITO certificates to operate at Off-Shore & On-Shore sites worldwide (BOSIET, FOET, HUET, CA-EBS, H2S, Norwegian Escape Chute).

Services Offered: Worldwide

  • Group 203 (1)

    Vendor Assistance & Support (Valves, Actuators, HIPPS, HPU’s & Subsea Systems)

  • Group 203 (1)

    Valve Repair/ Overhauls & Upgrades

  • Group 203 (1)

    Reverse Engineering on Valves & Actuators

  • Group 203 (1)

    Overall Projects Assistance (Engineering>Construction>Commissioning>Start-Up)

  • Group 203 (1)

    Production Plants Shut Down: Preparation & Execution (Off-Shore & On-Shore)

  • Group 203 (1)

    Maintenance & Preservation Activities

  • Group 203 (1)

    Assistance & Support for All Tests (FAT/SAT)

  • Group 203 (1)

    Procurement & Expediting of various OEM products and Spare Parts

The experience gained through decades of work on-field representing valve and actuator manufacturers, enabled us to solve all kind of problems and to work out solutions directly on-field for the majority of valve related criticalness, optimizing at best every involving project phase:

Group 225-min

Engineering
& Design

We provide assistance to engineering teams during projects design involving valves, actuators & related accessories by solving problems and clarifying doubts, in order to assure together that proper/optimal product will be purchased and installed. We provide also all necessary FAT services and/or other related technical assistance.

Rectangle 23 (1)-min
Rectangle 23 (2)-min

Construction &
Mechanical Completion

Within these stages we assist our clients during SAT activities, checking that materials delivered comes in accordance to expectations & related standards. We give all necessary support during valve installation procedures, hydro tests, line flushing, related loop checks and by performing functional tests, in order to speed-up and optimize the entire work flow sequences involved.

Commissioning
& Start-UP

These most critical phases are involving the major effort and it’s here that we play a very important role; we expedite all valve involving activities and valve troubleshoot during leak tests, assist and coordinate ITR’s termination, supervise local workshops/suppliers, assist and provide emergency procurement, cataloging spare parts, perform valve overhauls/repairs and related upgrades.

Rectangle 23 (3)-min
Rectangle 23 (4)-min (1)

Plant
Operations

During this last phase we give assistance and support to maintenance and operation teams by performing:

• Trainings to involved personnel

• Optimization of maintenance procedures

• Preservation plans preparation

• Plant shut down preparation & planning (Valve & Actuators related)